dspTrack
Copy Tag Tasks
When a user copies a Tag, all of the tasks assigned to the tag are copied. The following items associated with all of the tasks can also be copied:
- Users assigned to the tasks assigned to the tag
- Task dependencies for all tasks assigned to the tag
- Tags assigned to all tasks assigned to the tag
- Work List Event rules for all tasks assigned to the tag
- Work List Event validations for all tasks assigned to the tag
NOTE: Because tags are not plan specific, a user must specify the source plan and the destination plan when copying a tag.
A tag can be copied from the:
-
Tag page (Configuration > Tag Type > Tag Type icon)
-
Tag – All Types page (Configuration > Tag Type)
-
Plan Task Tag page (Configuration > Tag Type > Tag Type icon >Tasks)
-
Plan Tag page (Project > Plans > Tags)
To copy a tag:
- Navigate to the page to copy the tag.
- Select a tag in NAME.
-
Click Copy Tag Tasks.
NOTE: All items are enabled for copying by default.
- Click a check box to disable it if an item should not be copied.
- Click the Keep Source Tag check box to enable it if the original tag name should be applied to the copy of the tag in the destination plan.
-
Click Edit.
- Enter a suffix in the Task Copy Suffix field if the names of all copied tasks should have a suffix.
-
Select a plan in the Destination Plan ID list box.
NOTE: This is the plan to which the tag’s tasks will be copied.
-
Select a plan in the Source Plan ID list box.
NOTE: This is the plan from which the tag’s tasks will be copied.
- Enter a name for the copy of the tag in the Name field.
- Enter a description of the copy of the tag in the Description field.
- Click Save.
- Click Copy Tag Tasks; a confirmation message displays.
- Click Ok.
The copied tag displays on the Tag page applied to the plan and tasks in the Destination plan.